In 2016, the Denver, Colorado, Metro Waste Water Treatment Plant was being upgraded, which included demolition of the inlet channel. The channel was required to remain active during this process. GES Tech Group was retained to devise a method of safely removing 12″ thick channel roof sections. The final rigging operation was also designed and supervised by GES Tech Group.