Skip to content
Menu
☰
Close Menu
×
GES TECH GROUP, INC. HOME PAGE
Mechcanical & Power Systems
Florida Propane Gas Association and Propane Education Foundation of Florida
Denver Union Station Reginal Transportation District – Steam, Hot Water and Chiller Piping
Process Systems & Programmed Logic Controllers
West Virgina Drill Rig, Genset Vibration Analysis and Field Certification
INDUSTRIAL & COMMERCIAL PIPING SUPPORT
RIGGING & CRANE TESTS
MECHANICAL VIBRATION ANALYSIS
3 MW GENSET – BASE DESIGN
DNV OFFSHORE COMPRESOR
Kingsley Hydro Project
Southern Delivery System Pump Stations, Pipe Supports
StratCom Replacement Facility, Offutt AFB, NE
Church of Latter Day Saints (LDS), History Library HVAC
STRUCTURAL & CIVIL Vol 1
HIGH TEMPERATURE GENERATOR EXHAUST ROUTED THROUGH AND BETWEEN BUILDINGS
POST TENSIONED DECK ANCHORAGE: The Case of the missing hairpins
Event Center Moment Frame Distress Due to Snow Load
SOUTH AFRICA MINING, TRACTION THICKENER
SOUTH AFRICA MINING, DEEP PASTE THICKENER
Thickener Rake Arm Design, Severe Acid Environment
PEDESTRIAN BRIDGE, TRUSS
PEDESTRIAN BRIDGE, ARCH SUSPENSION
HIGH VOLTAGE INSULATOR SEISMIC DESIGN
Silver Lake Headworks Reservoir, LAW&P
Industrial Equipment Tower
Structural & Civil Vol 2
Matt Foundation, Mass Concrete Thermal Control
Multi-story Condo, Balcony Cracking
Concrete Corbel Repairs
Heavy Girder Connection, Design Defect
PROCESS VESSEL DESIGN, TRANSPORT AND LIFT ANALYSIS
BIOWHEEL Structural and Seismic Design
Demolition, WWTP, HiPOS, Denver, CO
METRO DENVER WWTP, DEMO OF ACTIVE INLET CHANNEL
Concrete Column Repair
Structural Floor
FORENSIC INVESTIGATIONS Vol 1
Industrial Accident with Fatality
Unique Water Feature Fail
ARENA FAILURE, SNOWLOAD
REINFORCED CONCRETE, WWT TANK
THICKENER FAILURE, BRAZIL
ORE SCREEN FAILURE
SHAFT TORSIONAL FAILURE
WICHITA WATER WALL FAILURE
HVAC: High Humidty Fail
POST TENSIONED BRIDGE ANCHORAGE FAILURE
GRAIN ELEVATOR BIN SIDE WALL INVESTIGATION
MF/UF Mebrane Filtration Header Failure
High Rise Building, Water Booster Pump Fail
30 Megawatt Power Plant, vibration investigation
PVC Pipeline Fail
Forensic Investigations Vol 2
CRANE OVERTURNING FAILURE
Traction Thickener Rake Arm Upset, Failure
EVAPORATOR/HEAT EXCHANGER STEAM JACKET CONDENSATE DRAIN LINE FATIGUE FAILURE
Combined Cycle Power Plant Condenser Ductwork Failure
Quail Creek Crossing, 24″ and 30″ BFV Vault Fail
Engine Driven Compressor, Unbalanced Couple Fail
Inverted Siphon Open Channel Flow Fail
Biowheel Drive Fail
Clear Well Reservoir, Thermal Differential Fail
Light Pole Fatigue Crack Fail
Vertical Elevator Fail
GRAIN SILO FARM HURRICANE DAMAGE
Rock Anchor Fail, Slab Hydrostatic Uplift
Insulated Concrete Forms
ADVANCED FINITE ELEMENT ANALYSIS
Special Projects
DOOR OPENING TOO SMALL, FAIL
Heat Straightening of Steel Plate
Dirty Power, VFD Trips
Proof Test, Concrete Anchors
Restoration, Nottingham Power Plant, Avon, CO
COASTAL ENGINEERING
News
Mechcanical & Power Systems