In 2011-12, GES Tech Group was retained to design a containerized engine and compressor skid for offshore applications in accordance with DNV* specifications, including rigging and impact loads during a full scale drop test. A DNV certified unit must pass an actual drop test in order to be accepted under DNV criteria.
*Det Norske Veritas
A full scale drop test is required under DNV specificaions in order to be granted certification. This test was performed with test masses to simulate the presence of the compressor components. Click the video links below for clips of the actual drop test and the FEA simulation submitted as part of the certification package.