ERECTION, RIGGING and CONSTRUCTION ENGINEERING,  Highland Pedestrian Bridge, Denver, Colorado 

 

            Ped_Bridge 20.JPG (6081679 bytes)                          FIG FEA 1.jpg (597232 bytes)                       Ped Bridge Award.JPG (809564 bytes)

Photo: Colorado Department of Transportation 

 

FINISHED PEDESTRIAN BRIDGE OVER I-25 AT 16th STREET, COMPUTER MODEL

and AWARD PRESENTED TO GES TECH GROUP, INC., FOR CONSTRUCTION AND ERECTION ENGINEERING

 

PED Bridge 1.JPG (1425193 bytes)    PED Bridge 3.JPG (1507930 bytes)

 

SHORING AND SHORING FOUNDATION DESIGN, EAST AND WEST SIDES, INSTALLATION SUPERVISION

 

PED Bridge 2.JPG (1557166 bytes)    Ped Bridge 4.JPG (1232401 bytes)

 

RIGGING FOR TRANSPORT TO ERECTION SITE, RIGGING OF EAST AND WEST PORTIONS AND ANCHORAGE TO FOUNDATIONS.  ARCH SECTIONS WERE FABRICATED AND TRANSPORTED IN AN INVERTED ORIENTATION.

 

Ped bridge 5.JPG (1315095 bytes)    Ped Bridge 6.JPG (1336959 bytes)

 

WEST PORTION RESTING ON SHORING OVERHANGING I-25 SOUTH BOUND TRAFFIC LANES

 

Ped Bridge 7.JPG (1355480 bytes)    Ped Bridge 8.JPG (1299157 bytes)

 

CENTER PORTION (100,000 LBS) IN FABRICATION YARD AND ALSO ON TRANSPORT TO ERECTION SITE

 

Ped bridge 9.JPG (1332887 bytes)    Ped Bridge 10.JPG (1389070 bytes)

 

FIG FEA 2.jpg (104827 bytes)    FIG FEA 3.jpg (129618 bytes)    FIG FEA 4.jpg (145094 bytes)    FIG FEA 5.jpg (106812 bytes)    FIG FEA 6.jpg (110541 bytes)

 

WEST AND CENTER PORTIONS WERE ROTATED 180 DEGREES DURING A SINGLE RIGGING OPERATION USING THREE CRANES.  PROCEDURE WAS DESIGNED BY GES TECH GROUP AND FULLY MODELED BY FINITE ELEMENT ANAYSIS.  ON SITE RIGGING AND ROTATION OPERATION WAS ALSO SUPERVISED BY GES TECH GROUP, INC.

 

Ped Bridge 11.JPG (1412261 bytes)    Ped Bridge 12.JPG (1329459 bytes)    Ped Bridge 13.JPG (1361027 bytes)    Ped Bridge 14.JPG (1414759 bytes)

 

 

 

Ped Bridge 17.JPG (1518947 bytes)    Ped Bridge 16.JPG (1242361 bytes)

 

CENTER PORTION IS SET IN PLACE AND SECURED

 

 

Ped Bridge 18.JPG (1468480 bytes)    Ped Bridge 19.JPG (563827 bytes)

 

DECK POUR IN PROGRESS, FOLLOWING INSTALLATION OF PERMANENT CABLES

and COMPLETED BRIDGE

 